- Planning for the procedure
- 1. Preparation for upgrade procedure
- 1.1 Ensure the SIMPL version is at least 6.13.3
- 1.2 Upload and unpack uplevel CSAR
- 1.3 Verify the downlevel CSAR is present
- 1.4 Apply patches (if appropriate)
- 1.5 Prepare downlevel config directory
- 1.6 Prepare uplevel config directory including an SDF
- 1.7 Update SDF
- 1.8 Reserve maintenance period
- 1.9 Carry out dry run
- 2. Upgrade procedure
- 3. Post-upgrade procedure
- 4. Post-acceptance
- 5. Backout Method of Procedure
This page explains how to upgrade the REM nodes.
The page is self-sufficient, that is, if you save or print this page, you have all the required information and instructions for upgrading REM nodes. However, before starting the procedure, make sure you are familiar with the operation of Rhino VM Automation nodes, this procedure, and the use of the SIMPL VM.
-
There are links in various places below to other parts of this book, which provide more detail about certain aspects of solution setup and configuration.
-
You can find more information about SIMPL VM commands in the SIMPL VM Documentation.
-
You can find more information on
rvtconfig
commands on thervtconfig
page.
Planning for the procedure
This procedure assumes that:
-
You are familiar with UNIX operating system basics, such as the use of
vi
and command-line tools likescp
. -
You are doing a minor upgrade of REM VMs, that is, upgrading from one minor release of version 3.2 to another.
-
You have deployed a SIMPL VM, version 6.13.3 or later. Output shown on this page is correct for version 6.13.3 of the SIMPL VM; it may differ slightly on later versions.
Check you are using a supported VNFI version:
Platform | Supported versions |
---|---|
OpenStack |
Newton to Wallaby |
VMware vSphere |
6.7 and 7.0 |
VMware vCloud |
10.2 |
Determine parameter values
In the below steps, replace parameters marked with angle brackets (such as <deployment ID>
)
with values as follows.
(Replace the angle brackets as well, so that they are not included in the final command to be run.)
-
<deployment ID>
: The deployment ID. You can find this at the top of the SDF. On this page, the example deployment IDmydeployment
is used. -
<site ID>
: A number for the site in the formDC1
throughDC32
. You can find this at the top of the SDF. -
<site name>
: The name of the site. You can find this at the top of the SDF. -
<MW duration in hours>
: The duration of the reserved maintenance period in hours. -
<CDS address>
: The management IP address of the first CDS node. -
<SIMPL VM IP address>
: The management IP address of the SIMPL VM. -
<CDS auth args>
(authentication arguments): If your CDS has Cassandra authentication enabled, replace this with the parameters-u <username> -k <secret ID>
to specify the configured Cassandra username and the secret ID of a secret containing the password for that Cassandra user. For example,./rvtconfig -c 1.2.3.4 -u cassandra-user -k cassandra-password-secret-id …
.If your CDS is not using Cassandra authentication, omit these arguments.
-
<service group name>
: The name of the service group (also known as a VNFC - a collection of VMs of the same type), which for Rhino VM Automation nodes will consist of all REM VMs in the site. This can be found in the SDF by identifying the REM VNFC and looking for itsname
field. -
<downlevel version>
: The current version of the VMs. On this page, the example version3.2-1-1.0.0
is used. -
<uplevel version>
: The version of the VMs you are upgrading to. On this page, the example version3.2-3-1.0.0
is used.
Tools and access
You must have the SSH keys required to access the SIMPL VM and the REM VMs that are to be upgraded.
The SIMPL VM must have the right permissions on the VNFI. Refer to the SIMPL VM documentation for more information:
When starting an SSH session to the SIMPL VM, use a keepalive of 30 seconds. This prevents the session from timing out - SIMPL VM automatically closes idle connections after a few minutes. When using OpenSSH (the SSH client on most Linux distributions), this can be controlled with the option
|
rvtconfig
is a command-line tool for configuring and managing Rhino VM Automation VMs.
All REM CSARs include this tool; once the CSAR is unpacked, you can find rvtconfig
in the resources
directory, for example:
$ cdcsars
$ cd rem/<uplevel version>
$ cd resources
$ ls rvtconfig
rvtconfig
The rest of this page assumes that you are running rvtconfig
from the directory in which it resides,
so that it can be invoked as ./rvtconfig
.
It assumes you use the uplevel version of rvtconfig
, unless instructed otherwise.
If it is explicitly specified you must use the downlevel version, you can find it here:
$ cdcsars
$ cd rem/<downlevel version>
$ cd resources
$ ls rvtconfig
rvtconfig
1. Preparation for upgrade procedure
These steps can be carried out in advance of the upgrade maintenance window. They should take less than 30 minutes to complete.
1.1 Ensure the SIMPL version is at least 6.13.3
Log into the SIMPL VM and run the command simpl-version
.
The SIMPL VM version is displayed at the top of the output:
SIMPL VM, version 6.13.3
Ensure this is at least 6.13.3. If not, contact your Customer Care Representative to organise upgrading the SIMPL VM before proceeding with the upgrade of the REM VMs.
Output shown on this page is correct for version 6.13.3 of the SIMPL VM; it may differ slightly on later versions.
1.2 Upload and unpack uplevel CSAR
Your Customer Care Representative will have provided you with the uplevel REM CSAR.
Use scp
to copy this to /csar-volume/csar/
on the SIMPL VM.
Once the copy is complete, run csar unpack /csar-volume/csar/<filename>
on the SIMPL VM
(replacing <filename>
with the filename of the CSAR, which will end with .zip
).
The csar unpack
command may fail if there is insufficient disk space available.
If this occurs, SIMPL VM will report this with instructions
to remove some CSARs to free up disk space.
You can list all unpacked CSARs with csar list
and remove a CSAR with csar remove <node type>/<version>
.
1.3 Verify the downlevel CSAR is present
On the SIMPL VM, run csar list
.
Each listed CSAR will be of the form <node type>/<version>
,
for example, rem/3.2-1-1.0.0
.
Ensure that there is a REM CSAR listed there with the current downlevel version.
If the downlevel CSAR is not present, obtain a copy of it,
then scp
it to the SIMPL VM and csar unpack
it as per the previous step.
1.4 Apply patches (if appropriate)
If you are upgrading to an image that doesn’t require patching, or have already applied the patch, skip this step.
To patch a set of VMs, rather than modify the code directly on the VMs, the procedure is instead to patch the CSAR on SIMPL VM and then upgrade to the patched CSAR.
If you have a patch to apply, it will be provided to you in the form of a .tar.gz
file.
Use scp
to transfer this file to /csar-volume/csar/
on the SIMPL VM.
Apply it to the uplevel CSAR by running csar efix rem/<uplevel version> <patch file>
,
for example, csar efix rem/3.2-3-1.0.0/csar-volume/csar/mypatch.tar.gz
.
This takes about five minutes to complete.
Check the output of the patching process states that SIMPL VM successfully created a patch.
Example output for a patch named mypatch
on version 3.2-3-1.0.0
and a vSphere deployment is:
Applying efix to rem/3.2-3-1.0.0
Patching rem-3.2-3-1.0.0-vsphere-mypatch.ova, this may take several minutes
Updating manifest
Successfully created rem/3.2-3-1.0.0-mypatch
You can verify that a patched CSAR now exists by running csar list
again -
you should see a CSAR named rem/<uplevel version>-<patch name>
(for the above example that would be rem/3.2-3-1.0.0-mypatch
).
For all future steps on this page, wherever you type the <uplevel version>
,
be sure to include the suffix with the patch name, for example 3.2-3-1.0.0-mypatch
.
If the csar efix
command fails, be sure to delete any partially-created patched CSAR before retrying the patch process.
Run csar list
as above, and if you see the patched CSAR, delete it with csar remove <CSAR>
.
1.5 Prepare downlevel config directory
If you keep the configuration hosted on the SIMPL VM,
find it and rename it to /home/admin/current-config
.
Verify the contents by running ls /home/admin/current-config
and checking that at least the SDF (sdf-rvt.yaml
) is present there.
If it isn’t, or you prefer to keep your configuration outside of the SIMPL VM,
then create this directory on the SIMPL VM:
mkdir /home/admin/current-config
Use scp
to upload the SDF (sdf-rvt.yaml
) to this directory.
1.6 Prepare uplevel config directory including an SDF
On the SIMPL VM, run mkdir /home/admin/uplevel-config
. This directory is for holding the uplevel configuration files.
Use scp
(or cp
if the files are already on the SIMPL VM,
for example in /home/admin/current-config
as detailed in the previous section)
to copy the following files to this directory.
Include configuration for the entire deployment, not just the REM nodes.
-
The uplevel configuration files.
-
The current SDF for the deployment.
-
Any certificates and private key files for REM:
rem-cert.crt
andrem-cert.key
. -
A directory of Rhino low-level overrides, if you have one.
1.7 Update SDF
Open the /home/admin/uplevel-config/sdf-rvt.yaml
file using vi
.
Find the vnfcs
section, and within that the REM VNFC.
Within the VNFC, locate the version
field and change its value to the uplevel version,
for example 3.2-3-1.0.0
.
Save and close the file.
You can verify the change you made by using diff -u2 /home/admin/current-config/sdf-rvt.yaml /home/admin/uplevel-config/sdf-rvt.yaml
.
The diff should look like this (context lines and line numbers may vary), with only a change to the version for the relevant node type:
--- sdf-rvt.yaml 2022-10-31 14:14:49.282166672 +1300
+++ sdf-rvt.yaml 2022-11-04 13:58:42.054003577 +1300
@@ -211,5 +211,5 @@
shcm-vnf: shcm
type: rem
- version: 3.2-1-1.0.0
+ version: 3.2-3-1.0.0
vim-configuration:
vsphere:
1.8 Reserve maintenance period
The upgrade procedure requires a maintenance period. For upgrading nodes in a live network, implement measures to mitigate any unforeseen events.
Ensure you reserve enough time for the maintenance period, which must include the time for a potential rollback.
You must also reserve time for:
-
The SIMPL VM to upload the image to the VNFI. Allow 2 minutes, unless the connectivity between SIMPL and the VNFI is particularly slow.
-
Any validation testing needed to determine whether the upgrade succeeded.
1.9 Carry out dry run
The csar update dry run command carries out more extensive validation of the SDF and VM states than rvtconfig validate does.
Carrying out this step now, before the upgrade is due to take place, ensures problems with the SDF files are identified early and can be rectified beforehand.
The --dry-run operation will not make any changes to your VMs, it is safe to run at any time, although we always recommend running it during a maintenance window if possible. |
Please run the following command to execute the dry run.
csar update --sdf /home/admin/uplevel-config/sdf-rvt.yaml --vnf rem --sites <site> --service-group <service_group> --dry-run
Confirm the output does not flag any problems or errors. The end of the command output should look similar to this.
You are about to update VMs as follows:
- VNF rem:
- For site <site>:
- update all VMs in VNFC service group <service_group>/4.1-5-1.0.0:
- rem-1 (index 0)
- rem-2 (index 1)
- rem-3 (index 2)
Please confirm the set of nodes you are upgrading looks correct, and that the software version against the service group correctly indicates the software version you are planning to upgrade to.
If you see any errors, please address them, then re-run the dry run command until it indicates success.
2. Upgrade procedure
2.1 Disable scheduled tasks
Only perform this step if this is the first, or only, node type being upgraded.
Run ./rvtconfig enter-maintenance-window -c <CDS address> <CDS auth args> -d <deployment ID> --site-id <site ID> --hours <MW duration in hours>
.
The output will look similar to:
Maintenance window is now active until 04 Nov 2022 21:38:06 NZDT.
Use the leave-maintenance-window command once maintenance is complete.
This will prevent scheduled tasks running on the VMs until the time given in the output.
If at any point in the upgrade process you wish to confirm the end time of the maintenance window,
you can run ./rvtconfig maintenance-window-status -c <CDS address> <CDS auth args> -d <deployment ID> --site-id <site ID>
.
2.2 Verify config has no unexpected or prohibited changes
Run rm -rf /home/admin/config-output
on the SIMPL VM to remove that directory if it already exists.
Then use the command
./rvtconfig compare-config -c <CDS address> <CDS auth args> -d <deployment ID> --input /home/admin/uplevel-config
to compare the live configuration to the configuration in the
--vm-version <downlevel version> --output-dir /home/admin/config-output -t rem/home/admin/uplevel-config
directory.
Example output is listed below:
Validating node type against the schema: rem
Redacting secrets…
Comparing live config for (version=3.2-1-1.0.0, deployment=mydeployment, group=RVT-rem.DC1) with local directory (version=3.2-3-1.0.0, deployment=mydeployment, group=RVT-rem.DC1)
Getting per-level configuration for version '3.2-1-1.0.0', deployment 'mydeployment', and group 'RVT-rem.DC1'
- Found config with hash 7f6cc1f3df35b43d6286f19c252311e09216e6115f314d0cb9cc3f3a24814395
Wrote currently uploaded configuration to /tmp/tmprh2uavbh
Redacting secrets…
Found
- 1 difference in file sdf-rvt.yaml
Differences have been written to /home/admin/config-output
Error: Line 110 exited with status 3
You can then view the differences using commands such as cat /home/admin/config-output/sdf-rvt.yaml.diff
(there will be one .diff
file for every file that has differences).
Aside from the version
parameter in the SDF, there should normally be no other changes.
If there are other unexpected changes, pause the procedure here and correct the configuration
by editing the files in /home/admin/uplevel-config
.
When performing a rolling upgrade, some elements of the uplevel configuration must remain identical to those in the downlevel configuration. The affected elements of the REM configuration are described in the following list:
-
The
secrets-private-key-id
in the SDF must not be altered. -
The ordering of the VM instances in the SDF must not be altered.
-
The IP addresses and other networking information in the SDF must not be altered.
The rvtconfig compare-config
command reports any unsupported changes as errors,
and may also emit warnings about other changes. For example:
Found
- 1 difference in file sdf-rvt.yaml
The configuration changes have the following ERRORS.
File sdf-rvt.yaml:
- Changing the IP addresses, subnets or traffic type assignments of live VMs is not supported. Restore the networks section of the rem VNFC in the SDF to its original value before uploading configuration.
Ensure you address the reported errors, if any, before proceeding.
rvtconfig
will not upload a set of configuration files that contains unsupported changes.
2.3 Validate configuration
Run the command ./rvtconfig validate -t rem -i /home/admin/uplevel-config
to check that the configuration files are correctly formatted, contain valid values, and are self-consistent.
A successful validation with no errors or warnings produces the following output.
Validating node type against the schema: rem
YAML for node type(s) ['rem'] validates against the schema
If the output contains validation errors,
fix the configuration in the /home/admin/uplevel-config
directory
and go back to the Verify config has no unexpected or prohibited changes step.
If the output contains validation warnings, consider whether you wish to address them before performing the upgrade. The VMs will accept configuration that has validation warnings, but certain functions may not work.
2.4 Upload configuration
CDS stores configuration against a specific version. You need to upload the uplevel configuration even if it is identical to the downlevel configuration or you are just patching the VMs. |
Upload the configuration to CDS:
./rvtconfig upload-config -c <CDS address> <CDS auth args> -t rem -i /home/admin/uplevel-config --vm-version <uplevel version>
Check that the output confirms that configuration exists in CDS for both the current (downlevel) version and the uplevel version:
Validating node type against the schema: rem
Preparing configuration for node type rem…
Checking differences between uploaded configuration and provided files
Getting per-level configuration for version '3.2-3-1.0.0', deployment 'mydeployment-rem', and group 'RVT-rem.DC1'
- No configuration found
No uploaded configuration was found: this appears to be a new install or upgrade
Encrypting secrets…
Wrote config for version '3.2-3-1.0.0', deployment ID 'mydeployment', and group ID 'RVT-rem.DC1'
Versions in group RVT-rem.DC1
=============================
- Version: 3.2-1-1.0.0
Config hash: 7f6cc1f3df35b43d6286f19c252311e09216e6115f314d0cb9cc3f3a24814395
Active: mydeployment-rem-1, mydeployment-rem-2, mydeployment-rem-3
Leader seed: mydeployment-rem-1
- Version: 3.2-3-1.0.0
Config hash: f790cc96688452fdf871d4f743b927ce8c30a70e3ccb9e63773fc05c97c1d6ea
Active: None
Leader seed:
2.5 Collect diagnostics
We recommend gathering diagnostic archives for all REM VMs in the deployment.
On the SIMPL VM, run the command
./rvtconfig gather-diags --sdf /home/admin/uplevel-config/sdf-rvt.yaml -t rem --ssh-key-secret-id <SSH key secret ID> --output-dir <diags-bundle>
.
If <diags-bundle>
does not exist, the command will create the directory for you.
Each diagnostic archive can be up to 200 MB per VM. Ensure you have enough disk space on the SIMPL VM to collect all diagnostics. The command will be aborted if the SIMPL VM does not have enough disk space to collect all diagnostic archives from all the VMs in your deployment specified in the provided SDF.
2.6 Begin the upgrade
Carry out a csar import of the rem VMs
Prepare for the upgrade by running the following command on the SIMPL VM csar import --vnf rem --sdf /home/admin/uplevel-config/sdf-rvt.yaml
to import terraform templates.
First, SIMPL VM connects to your VNFI to check the credentials specified in the SDF and QSG are correct.
If this is successful, it displays the message All validation checks passed.
.
Next, SIMPL VM compares the SDF you provided with the one that was previously used to deploy or upgrade the REM nodes.
Since the version has changed, you should see the following prompt
(details may vary, but the key point is that the version
line in the SDF will have changed):
The following changes have been made to the SDF since it was used to deploy/update rem
(Note: if only a subset of VMs were deployed or updated previously, then this diff won't fully reflect the changes that will be made to the other VMs in the deployment)
---
+++
@@ -144,8 +144,8 @@
shcm-vnf: shcm
use-client-to-node-cassandra-encryption: false
type: rem
- version: 3.2-1-1.0.0
+ version: 3.2-3-1.0.0
vim-configuration:
vsphere:
Do you want to continue? [yes/no]:
If the differences are not as you expect - they should normally just be the version
field - then:
-
Type
no
. The csar import will be aborted. -
Investigate why there are unexpected changes in the SDF.
-
Correct the SDF as necessary.
-
Retry this step.
Otherwise, accept the prompt by typing yes
.
After you do this, SIMPL VM will import the terraform state. If successful, it outputs this message:
Done. Imported all VNFs.
If the output does not look like this, investigate and resolve the underlying cause, then re-run the import command again until it shows the expected output.
Begin the upgrade of the rem VMs
Begin the upgrade procedure by running the following command on the SIMPL VM:
csar update --vnf rem --sdf /home/admin/uplevel-config/sdf-rvt.yaml
.
First, SIMPL VM connects to your VNFI to check the credentials specified in the SDF and QSG are correct.
If this is successful, it displays the message All validation checks passed.
.
Next, SIMPL VM compares the specified SDF with the SDF used for the csar import command above. Since the contents have not changed since you ran the csar import, the output should indicate that the SDF has not changed.
If there are differences in the SDF, a message similar to this will be output:
Comparing current SDF with previously used SDF.
site site1:
rem:
rem-1:
networks:
- ip-addresses:
ip:
- - 10.244.21.106
+ - 10.244.21.196
- 10.244.21.107
name: Management
subnet: mgmt-subnet
Do you want to continue? [yes/no]: yes
If you see this, you must:
-
Type
no
. The upgrade will be aborted. -
Go back to the start of the upgrade section and run through the csar import section again, until the SDF differences are resolved.
-
Retry this step.
Afterwards, the SIMPL VM displays the VMs that will be upgraded:
You are about to update VMs as follows:
- VNF rem:
- For site site1:
- update all VMs in VNFC service group mydeployment-rem/3.2-3-1.0.0:
- mydeployment-rem-1 (index 0)
- mydeployment-rem-2 (index 1)
- mydeployment-rem-3 (index 2)
Type 'yes' to continue, or run 'csar update --help' for more information.
Continue? [yes/no]:
Check this output displays the version you expect (the uplevel version)
and exactly the set of VMs that you expect to be upgraded.
If anything looks incorrect, type no
to abort the upgrade process,
and recheck the VMs listed and the version field in /home/admin/uplevel-config/sdf-rvt.yaml
.
Also check you are passing the correct SDF path and --vnf
argument to the csar update
command.
Otherwise, accept the prompt by typing yes
.
Next, each VM in your cluster will perform health checks. If successful, the output will look similar to this.
Running ansible scripts in '/home/admin/.local/share/csar/rem/4.1-1-1.0.0/update_healthcheck_scripts' for node 'mydeployment-rem-1'
Running script: check_config_uploaded…
Running script: check_ping_management_ip…
Running script: check_maintenance_window…
Running script: check_can_sudo…
Running script: check_converged…
Running script: check_liveness…
Running script: check_rhino_alarms…
Detailed output can be found in /var/log/csar/ansible_output-2023-01-05-02-05-51.log
All ansible update healthchecks have passed successfully
If a script fails, you can find details in the log file. The log file can be found in /var/log/csar/ansible_output-<timestamp>.log
.
Running ansible scripts in '/home/admin/.local/share/csar/rem/4.1-1-1.0.0/update_healthcheck_scripts' for node 'mydeployment-rem-1'
Running script: check_config_uploaded...
Running script: check_ping_management_ip...
Running script: check_maintenance_window...
Running script: check_can_sudo...
Running script: check_converged...
Running script: check_liveness...
ERROR: Script failed. Specific error lines from the ansible output will be logged to screen. For more details see the ansible_output file (/var/log/csar/ansible_output-2023-01-05-21-02-17.log). This file has only ansible output, unlike the main command log file.
fatal: [mydeployment-rem-1]: FAILED! => {"ansible_facts": {"liveness_report": {"cassandra": true, "cassandra_ramdisk": true, "cassandra_repair_timer": true, "cdsreport": true, "cleanup_sbbs_activities": false, "config_hash_report": true, "docker": true, "initconf": true, "linkerd": true, "mdm_state_and_status_ok": true, "mdmreport": true, "nginx": true, "no_ocss7_alarms": true, "ocss7": true, "postgres": true, "rem": true, "restart_rhino": true, "rhino": true}}, "attempts": 1, "changed": false, "msg": "The following liveness checks failed: ['cleanup_sbbs_activities']", "supports_liveness_checks": true}
Running script: check_rhino_alarms...
Detailed output can be found in /var/log/csar/ansible_output-2023-01-05-21-02-17.log
***Some tests failed for CSAR 'rem/4.1-1-1.0.0' - see output above***
The msg
field under each ansible task explains why the script failed.
If there are failures, investigate them with the help of your Customer Care Representative and the Troubleshooting pages.
Retry this step once all failures have been corrected by running the command csar update …
as described at the begining of this section.
Once the pre-upgrade health checks have been verified, SIMPL VM now proceeds to upgrade each of the VMs.
Monitor the further output of csar update
as the upgrade progresses, as described in the next step.
2.7 Monitor csar update
output
For each VM (or group of VMs in the case of a parallel upgrade):
-
The VM(s) will be quiesced and destroyed.
-
SIMPL VM will create a replacement VM(s) using the uplevel version.
-
The VM(s) will automatically start applying configuration from the files you uploaded to CDS in the above steps.
-
Once configuration is complete, the VM(s) are ready for service. At this point, the
csar update
command moves on to the next REM VM (or group of VMs).
The output of the csar update
command will look something like the following, repeated for each VM.
Decommissioning 'dc1-mydeployment-rem-1' in MDM, passing desired version 'vm.version=3.2-3-1.0.0', with a 900 second timeout
dc1-mydeployment-rem-1: Current status 'complete', current state 'commissioned' - desired status 'complete', desired state 'decommissioned'
dc1-mydeployment-rem-1: Current status 'in_progress'- desired status 'complete'
…
dc1-mydeployment-rem-1: Current status 'complete', current state 'decommissioned' - desired status 'complete', desired state 'decommissioned'
Running update for VM group [0]
Performing health checks for service group mydeployment-rem with a 1200 second timeout
Running MDM status health-check for dc1-mydeployment-rem-1
dc1-mydeployment-rem-1: Current status 'in_progress'- desired status 'complete'
…
dc1-mydeployment-rem-1: Current status 'complete', current state 'commissioned' - desired status 'complete', desired state 'commissioned'
If you see this error:
it can be safely ignored, provided that you do eventually see a |
Once all VMs have been upgraded, you should see this success message, detailing all the VMs that were upgraded and the version they are now running, which should be the uplevel version.
Successful VNF with full per-VNFC upgrade state:
VNF: rem
VNFC: mydeployment-rem
- Node name: mydeployment-rem-1
- Version: 3.2-3-1.0.0
- Build Date: 2022-11-21T22:58:24+00:00
- Node name: mydeployment-rem-2
- Version: 3.2-3-1.0.0
- Build Date: 2022-11-21T22:58:24+00:00
- Node name: mydeployment-rem-3
- Version: 3.2-3-1.0.0
- Build Date: 2022-11-21T22:58:24+00:00
If the upgrade fails, you will see Failed VNF
instead of Successful VNF
in the above output.
There will also be more details of what went wrong printed before that.
Refer to the Backout procedure below.
2.8 Run basic validation tests
Run csar validate --vnf rem --sdf /home/admin/uplevel-config/sdf-rvt.yaml
to perform some basic validation tests against the uplevel nodes.
This command first performs a check that the nodes are connected to MDM and reporting that they have successfully applied the uplevel configuration:
========================
Performing healthchecks
========================
Commencing healthcheck of VNF 'rem'
Performing health checks for service group mydeployment-rem with a 0 second timeout
Running MDM status health-check for dc1-mydeployment-rem-1
dc1-mydeployment-rem-1: Current status 'complete', current state 'commissioned' - desired status 'complete', desired state 'commissioned'
Running MDM status health-check for dc1-mydeployment-rem-2
dc1-mydeployment-rem-2: Current status 'complete', current state 'commissioned' - desired status 'complete', desired state 'commissioned'
Running MDM status health-check for dc1-mydeployment-rem-3
dc1-mydeployment-rem-3: Current status 'complete', current state 'commissioned' - desired status 'complete', desired state 'commissioned'
After that, it performs various checks on the health of the VMs' networking and services:
================================
Running validation test scripts
================================
Running validation tests in CSAR 'rem/3.2-3-1.0.0'
Test running for: mydeployment-rem-1
Running script: check_ping_management_ip…
Running script: check_can_sudo…
Running script: check_converged…
Running script: check_liveness…
Detailed output can be found in /var/log/csar/ansible_output-2023-01-06-03-21-51.log
If all is well, then you should see the message
All tests passed for CSAR 'rem/<uplevel version>'!
.
If the VM validation fails, you can find details in the log file. The log file can be found in /var/log/csar/ansible_output-<timestamp>.log
.
Running validation test scripts
================================
Running validation tests in CSAR 'rem/3.2-3-1.0.0'
Test running for: mydeployment-rem-1
Running script: check_ping_management_ip...
Running script: check_can_sudo...
Running script: check_converged...
Running script: check_liveness...
ERROR: Script failed. Specific error lines from the ansible output will be logged to screen. For more details see the ansible_output file (/var/log/csar/ansible_output-2023-01-06-03-40-37.log). This file has only ansible output, unlike the main command log file.
fatal: [mydeployment-rem-1]: FAILED! => {"ansible_facts": {"liveness_report": {"cassandra": true, "cassandra_ramdisk": true, "cassandra_repair_timer": true, "cdsreport": true, "cleanup_sbbs_activities": false, "config_hash_report": true, "docker": true, "initconf": true, "linkerd": true, "mdm_state_and_status_ok": true, "mdmreport": true, "nginx": true, "no_ocss7_alarms": true, "ocss7": true, "postgres": true, "rem": true, "restart_rhino": true, "rhino": true}}, "attempts": 1, "changed": false, "msg": "The following liveness checks failed: ['cleanup_sbbs_activities']", "supports_liveness_checks": true}
Running script: check_rhino_alarms...
Detailed output can be found in /var/log/csar/ansible_output-2023-01-06-03-40-37.log
***Some tests failed for CSAR 'rem/3.2-3-1.0.0' - see output above***
----------------------------------------------------------
WARNING: Validation script tests failed for the following CSARs:
- 'rem/3.2-3-1.0.0'
See output above for full details
The msg
field under each ansible task explains why the script failed.
If there are failures, investigate them with the help of your Customer Care Representative and the Troubleshooting pages.
3. Post-upgrade procedure
Only perform these steps if this is the last or only node type being upgraded.
3.1 Enable scheduled tasks
Run ./rvtconfig leave-maintenance-window -c <CDS address> <CDS auth args> -d <deployment ID> --site-id <site ID>
.
This will allow scheduled tasks to run on the VMs again.
The output should look like this:
Maintenance window has been terminated.
The VMs will resume running scheduled tasks as per their configured schedules.
4. Post-acceptance
The upgrade of the REM nodes is now complete.
After you have been running with the REM nodes at the uplevel version for a while, you may want to perform post-acceptance tasks.
5. Backout Method of Procedure
First, gather the log history of the downlevel VMs. Run mkdir -p /home/admin/rvt-log-history
and ./rvtconfig export-log-history -c <CDS address> <CDS auth args> -d <deployment ID> --zip-destination-dir /home/admin/rvt-log-history --secrets-private-key-id <secret ID>
.
The secret ID you specify for --secrets-private-key-id
should be the secret ID for the secrets private key
(the one used to encrypt sensitive fields in CDS). You can find this in the product-options
section of each VNFC in the SDF.
Make sure the <CDS address> used is one of the remaining available TSN nodes.
|
Next, how much of the backout procedure to run depends on how much progress was made with the upgrade.
If you did not get to the point of running csar update
, start from the Cleanup after backout section below.
If you ran csar update
and it failed,
the first step is to determine which nodes are uplevel and which are downlevel.
Run
./rvtconfig report-group-status -c <CDS address> <CDS auth args> -d <deployment ID> -g <group ID> --ssh-key-secret-id <secret ID>
,
where you specify the secret ID of the SSH key used for validation tests.
This secret ID can be found in the SDF - it will be specified under private-key-id
in the ssh
section for each VM.
The output of report-group-status
lists, for each version, which VMs are running that version and their current status.
You can ignore any errors for VMs running the uplevel version because these VMs are about to be rolled back.
If any of the VMs running the downlevel version are showing errors:
-
Follow the steps in the Redeploying one node to redeploy, one VM at a time, any VMs that are showing CDS or MDM errors in
report-group-status
. -
After redeploying as many nodes as necessary, perform a rollback of any VMs that are still on the uplevel version as per the below steps.
If you encounter further failures during recovery or rollback, contact your Customer Care Representative to investigate and recover the deployment.
5.1 Collect diagnostics
We recommend gathering diagnostic archives for all REM VMs in the deployment.
On the SIMPL VM, run the command
./rvtconfig gather-diags --sdf /home/admin/uplevel-config/sdf-rvt.yaml -t rem --ssh-key-secret-id <SSH key secret ID> --output-dir <diags-bundle>
.
If <diags-bundle>
does not exist, the command will create the directory for you.
Each diagnostic archive can be up to 200 MB per VM. Ensure you have enough disk space on the SIMPL VM to collect all diagnostics. The command will be aborted if the SIMPL VM does not have enough disk space to collect all diagnostic archives from all the VMs in your deployment specified in the provided SDF.
5.2 Disable scheduled tasks
Only perform this step if this is the first, or only, node type being rolled back.
You can also skip this step if the rollback is occurring immediately after a failed upgrade,
such that the existing maintenance window is sufficient.
You can check the remaining maintenance window time with ./rvtconfig maintenance-window-status -c <CDS address> <CDS auth args> -d <deployment ID> --site-id <site ID>
.
To start a new maintenance window (or extend an existing one),
run ./rvtconfig enter-maintenance-window -c <CDS address> <CDS auth args> -d <deployment ID> --site-id <site ID> --hours <MW duration in hours>
.
The output will look similar to:
Maintenance window is now active until 04 Nov 2022 21:38:06 NZDT.
Use the leave-maintenance-window command once maintenance is complete.
This will prevent scheduled tasks running on the VMs until the time given in the output.
If at any point in the rollback process you wish to confirm the end time of the maintenance window,
you can run the above rvtconfig maintenance-window-status
command.
5.3 Roll back VMs
To roll back the VMs, the procedure is essentially to perform an "upgrade" back to the downlevel version,
that is, with <downlevel version>
and <uplevel version>
swapped.
You can refer to the Begin the upgrade section above for details on the prompts and output of csar update
.
Run csar update --skip pre-update-checks --vnf rem --sdf /home/admin/current-config/sdf-rvt.yaml --sites <site name> --service-group <service group name> --index-range <index range>
.
Once the csar update
command completes successfully, proceed with the next steps below.
The Contiguous ranges can be expressed with a hyphen ( If you want to roll back just one node, use If you want to roll back all nodes, omit the The |
If csar update
fails, check the output for which VMs failed.
For each VM that failed, run csar redeploy --vm <failed VM name> --sdf /home/admin/current-config/sdf-rvt.yaml
.
If csar redeploy
fails, contact your Customer Care Representative to start the recovery procedures.
If all the csar redeploy
commands were successful, then run the previously used csar update
command
on the VMs that were neither rolled back nor redeployed yet.
To help you determine which VMs were neither rolled back nor redeployed yet,
run |
5.4 Delete uplevel CDS data
Run ./rvtconfig delete-node-type-version -c <CDS address> <CDS auth args> -t rem --vm-version <uplevel version>
to remove data for the uplevel version from CDS.
-d <deployment ID> --site-id <site ID> --ssh-key-secret-id <SSH key secret ID>
Example output from the command:
This will destroy all configuration and runtime state for the specified node type and version.
This must not be performed while VMs of this type and version are running.
Requested deletion of version '3.2-3-1.0.0'
VM status for version '3.2-3-1.0.0':
- 1.2.3.4 (mydeployment-rem-1) different version (3.2-1-1.0.0)
- 1.2.3.5 (mydeployment-rem-2) different version (3.2-1-1.0.0)
- 1.2.3.6 (mydeployment-rem-3) different version (3.2-1-1.0.0)
Delete version 3.2-3-1.0.0? Y/[N]
Check in the output that the VMs are running the downlevel version (they should all say different version
)
and then type "Y" to confirm the deletion of the data for the uplevel version.
The command will offer one further prompt for you to double-check that the uplevel version is being deleted
and the downlevel version is being retained:
The following versions will be deleted: 3.2-3-1.0.0
The following versions will be retained: 3.2-1-1.0.0
Do you wish to continue? Y/[N] Y
Check the versions are the correct way around, and then confirm this prompt to delete the uplevel data from CDS.
Backout procedure
-
If desired, remove the uplevel CSAR. On the SIMPL VM, run
csar remove rem/<uplevel version>
. -
If desired, remove the uplevel config directories on the SIMPL VM with
rm -rf /home/admin/uplevel-config
. We recommend these files are kept in case the upgrade is attempted again at a later time.
5.6 Enable scheduled tasks
Run ./rvtconfig leave-maintenance-window -c <CDS address> <CDS auth args> -d <deployment ID> --site-id <site ID>
.
This will allow scheduled tasks to run on the VMs again.
The output should look like this:
Maintenance window has been terminated.
The VMs will resume running scheduled tasks as per their configured schedules.
5.7 Verify service is restored
Perform verification tests to ensure the deployment is functioning as expected.
If applicable, contact your Customer Care Representative to investigate the cause of the upgrade failure.
Before re-attempting the upgrade, ensure you have run the You will also need to re-upload the uplevel configuration. |